caribbean

City Hotel & Residences, Caribbean

Securing a reliable power supply,
10% reduction in cost and
95% electricity from solar PV for the newly built Residences.

Situation
  • Increasing grid electricity prices
  • Unreliable grid connection.
  • Construction of new residences: 40 units connected to existing City Hotel including 121 units, restaurants, swimming pools, charging EV station.
  • Total annual electricity load: 375 MWh
Objectives
  • Secure a reliable high quality power supply.
  • Secure a long-term reduction in cost of electricity.
Energy-as-a-Service
  • 160 kWp rooftop solar power plant.
  • 60 kW / 270 kWh battery energy storage system.
  • 75 kW diesel genset.
  • 10 years Power Service Agreement yielding to a reduction in total cost of electricity of 10%.