Remote Beach Resort, Cost Rica

Reliable Power with 15% reduction in cost

Situation
  • Unreliable grid connection.
  • Backup diesel generator.
  • 22 suites and 61 rooms, 2 restaurants, swimming pool, gym and spa.
  • Annual electricity load: 1.4 GWh
Objectives
  • Secure a reliable high quality power supply.
  • Reduce grid cost (remove consumption during peak tariff periods).
Energy-as-a-Service
  • 500 kW / 1.1 MWh battery energy storage system.
  • 10 years Power Service Agreement yielding to a reduction in total cost of electricity of 15%.